The film What you get Codes Pricing Demo Send a job

Takeoffs and pricing for the openings trade

Bid set in. Every opening, read. Every spec section, read. Checked against the code. Every conflict, caught. Priced from current catalogs. Astragal.

Send a bid set. Get back a complete takeoff: every opening, every hardware set, every spec section read, every opening checked against IBC, NFPA 80, ADA and the local amendments, and every conflict written up as an RFI. Take it a step further and Astragal prices it from current manufacturer list prices, with the source on every line.

Send a job, first one's free
  • 0openings read
  • 0code checks
  • 0RFIs written
  • $0priced from list

The Case File · No. 01

Door 113.

One line on a door schedule, a spec section, and a code reference that do not agree. Sixty-four seconds on how Astragal reads a bid set, writes the RFI, fixes the hardware set and prices it from current list.

  1. The schedule
  2. Spec 08 11 13
  3. NFPA 80 and the code
  4. The takeoff and the RFI
  5. Fixing the set
  6. Priced from list
Sample project. Hardware and prices shown for illustration.

What you get

Built for the person who has to defend the number.

Send the bid set. Get back one workbook your estimator can check against the drawings and price without re-counting, with the questions already written up.

You send

  • Door schedule, floor plans, hardware specification, addenda — PDFs or a link
  • For an estimate: your supplier multipliers or price sheets (kept confidential, used only for your work)

You get back

  • One workbook, seven tabs: Openings · Doors · Frames · Hardware Sets · Quantities & List · RFI Log · Assumptions
  • Catalog number and list price on every hardware line, from the price book in force on the bid date, edition named
  • Frames grouped by profile, gauge, jamb depth and anchors, ready for a Mesker or Steelcraft order form
  • Estimate: the same workbook priced at your multipliers, plus a hardware schedule and a draft proposal for your letterhead

Cost and timing

  • Flat price by opening count. Takeoff from $149, estimate from $249 — full price table
  • First job free, up to 25 openings, so you can check our count against your own before paying for any
  • Same business day up to 25 openings, next business day up to 150; count, price and date confirmed by email before work starts
  • Guarantee: if our count misses an opening scheduled in the documents you sent, that job is free
Download the sample workbook (.xlsx) Send a job, first one's free The sample is the 14-opening job in the film and the demo. Open the Quantities & List tab and type your multiplier into column H.

Conventions

The things a detailer checks first.

These are fixed. They are written on the cover tab of every workbook so the person checking the count does not have to ask.

Who does the work

A working Division 08 estimator, not a call center.

Astragal is run by Billy Wren of Quantum Entry Systems, a Division 08 supplier in Texas: the same estimator who writes door and hardware schedules for architects and bids them to general contractors. The software behind the takeoff is patent pending and opens to clients in 2027. The service is available now.

Three things we will not do

  1. We never bid a project a client sends us. If we are already bidding it, we tell you and decline the job.
  2. Your multipliers, pricing and proposals stay yours. They are not shared, pooled or reused.
  3. We do not guess and call it a count. Anything the documents leave open goes on the RFI Log with what we carried, in writing.

Specs and codes

Read against the spec, the model code, and the city that adopted it.

Every opening is checked three ways. The spec sections say what to furnish. The model codes say what the opening has to do. The local amendments say where this jurisdiction disagrees. Where the three do not line up, it goes on the RFI Log with a section number, not a hunch.

DIVISION 08 SPEC SECTIONS

Read section by section, with the paragraph cited on the takeoff.

  • 08 11 13 Hollow metal doors and frames: gauge, profile, anchors, labels, preps
  • 08 14 16 Flush wood doors: grade, species, core, rating, factory machining
  • 08 41 13 Aluminum storefront entrances: deadlocks, cylinders, closers, thresholds
  • 08 71 00 Door hardware: sets, functions, finishes, keying, electrified openings
  • 08 80 00 Glazing: lite kits, fire-rated glass, safety glazing at doors
  • 01 and 07 series Submittals, substitutions, and the fire-stopping that follows a rated frame

MODEL CODES AND STANDARDS

The ones the documents name; on most U.S. projects, these.

  • IBC Ch. 10 Means of egress: 1010.1.1 clear width, 1010.1.3 swing, 1010.2 locks and latches, 1010.2.9 panic hardware, 1010.3 delayed and controlled egress
  • IBC 716 / NFPA 80 Fire door and frame assemblies: ratings by wall, labels, closers, latching, gasketing, glazing limits
  • NFPA 101 Where the owner or AHJ adopts it: health-care and existing-building provisions
  • NFPA 105 Smoke door assemblies at corridors and smoke barriers
  • ADA 404 / ICC A117.1 Maneuvering clearances, 34"–48" hardware, 5 lbf interior force, 1/2" thresholds, 10" smooth bottom rail
  • UL 10C / UL 1784 Positive-pressure fire tests and smoke leakage, where the spec calls them

LOCAL AMENDMENTS

The city or state edits the model code, and the schedule rarely knows.

  • Edition Which IBC year the jurisdiction adopted, and its published amendments (Texas cities on the 2021 IBC with local amendments; Colorado and Oklahoma municipalities on their own cycles)
  • Texas TAS (Texas Accessibility Standards) and TDLR review alongside ADA
  • Fire marshal Local keying, Knox box, and entrance-locking rules, such as double-cylinder entrances with the required "remain unlocked" signage
  • Health-care and schools State licensing rules that change ratings, closers and locking functions on treatment and classroom doors
  • What we do We cite the amendment on the RFI and let the architect and the AHJ make the call. We do not stamp drawings; we make sure the question gets asked before the frames are set

The takeoff is an estimator's review of the openings, not the architect's code review and not a substitute for the authority having jurisdiction. Its job is to get the questions asked before bid day, and to make sure the number you carry already includes the closer, the label and the panic device the code is going to require anyway.

Try it yourself

From bid set to priced proposal. Follow one job through.

Astragal is an estimating platform for the openings trade, coming in 2027. This walk-through uses a sample project, a 14-opening medical office suite, with sample pricing.

A-601Floor plan and door scheduleSample project, not for construction